Business-purpose property finance Australia-wide

info@basicfinanceloans.com.au0439 462 664

COST TO COMPLETE FINANCE · AUSTRALIA

Cost to complete finance built around the remaining work.

Finance for eligible property developments where the current debt, work completed, remaining scope, contingency and path to repayment can be independently tested. Every structure is subject to valuation, due diligence and lender criteria.

✓ Business-purpose finance only✓ Evidence-led assessment✓ No approval or settlement guarantees
01

Budget shortfallVerified remaining cost exceeds available funds

02

Stopped drawdownsExisting lender will not release further capital

03

Cost overrunsRevised scope, contracts or delivery costs

04

Builder transitionNew delivery team and updated completion plan

THE CORE QUESTION

Is every remaining dollar identified and fundable?

Cost-to-complete finance starts with the gap between the capital available today and the independently verified amount required to reach practical completion. It is not simply a top-up based on an estimate.

A lender needs a reconciled position: existing debt and payouts, completed work, unpaid claims, remaining trade costs, consultants, statutory charges, contingency, interest and fees. The proposed facility must then fit within accepted value and a supportable exit.

01

Complete remaining works

Fund a verified construction scope through controlled progress payments and project monitoring.

02

Refinance and finish

Replace existing debt while separately accounting for the capital required to complete the project.

03

Address cost overruns

Assess evidenced increases caused by scope changes, defects, delays, escalation or builder transition.

04

Acquire an incomplete site

Consider acquisition and completion as one integrated business-purpose funding requirement.

COST RECONCILIATION

What specialist lenders need to see.

01Current project positionTitle, approvals, contracts, physical progress, defects, claims and work completed.
02Existing exposureCurrent debt, payout figures, available undrawn funds, caveats, priorities and unpaid liabilities.
03Verified remaining budgetQuantity-surveyor evidence, revised contract, trade schedule, consultants, statutory costs and contingency.
04Delivery and repaymentCapable builder, realistic program, project controls, presales or refinance evidence and contingency exit.
Facility size: determined case by case from accepted value, total exposure, verified remaining costs, available equity, delivery evidence and lender appetite.
TOTAL CAPITAL REQUIREMENTEVIDENCE BEFORE STRUCTURE

The cost-to-complete equation

Existing debt and payouts+Verified remaining costs+Contingency, interest and fees= Total exposure
Current valueLender accepted
Remaining budgetIndependently tested
Potential structureCase by case

Important: a lender may use an as-is, as-if-complete or other accepted value and may impose loan-to-value and loan-to-cost limits. Additional equity or revised project terms may be required, and an application may be reduced or declined.

WHO IT MAY SUIT

A defined shortfall with a credible cure.

Potential borrowers include experienced developers, project entities, commercial property owners and investors completing an eligible development for a genuine business purpose.

✓Completed work and remaining scope can be independently verified
✓The updated budget includes a realistic contingency
✓The builder and consultants can deliver the revised program
✓Approvals, insurance and material project risks are understood
✓The exit has supporting sales, refinance or liquidity evidence

Discuss the funding gap →

FROM BUDGET GAP TO CONTROLLED DRAWS

A disciplined cost-to-complete process.

01

Initial project review

Map the borrower, purpose, security, current debt, project stage, funding gap, deadline and exit.

02

Evidence and reconciliation

Collect current reports and reconcile completed work, unpaid costs, remaining scope and contingency.

03

Indicative structure

Compare total exposure, accepted value, drawdown controls, equity requirement, term and repayment plan.

04

Due diligence and settlement

Complete valuation, quantity-surveyor review, credit assessment, legal documents and lender conditions.

CHOOSE THE RIGHT COMPLETION PATHWAY

Cost-to-complete finance is not the same as general construction finance.

This page addresses the verified budget required to finish work already underway. For a broader refinance, rescue or completion pathway, review our Construction Completion Finance page.

Explore Construction Completion Finance →

Cost to completeQuantifies and funds the remaining verified budget
Construction completionBroader refinance and project-completion strategy
Distressed constructionAddresses deeper default, enforcement or delivery stress
Development exitRefinances completed or near-completed stock

Changing builders? Rebuild the remaining-cost schedule.

A replacement quote may not cover everything needed to restart and finish. Ask the proposed builder and independent project adviser to identify exclusions, rectification work, mobilisation costs, site protection, consultant costs and the revised program.

Separate unpaid claims for work already completed from the price of future works. Reconcile those items with the quantity surveyor’s report so the same work is not counted twice and disputed amounts are not silently omitted. Ask your solicitor to review unresolved contract and payment issues before treating the transition as settled.

Likewise, an undrawn loan balance is not necessarily money available to spend. Confirm whether the existing lender will release it and what conditions remain. Show available equity separately, identify who will fund any gap, and include a contingency appropriate to the revised scope.

The practical test: can the updated funding schedule pay for the verified work, outstanding obligations and financing costs through to the proposed repayment date? A new contractor alone does not establish that the project is fully funded or financeable.

PREPARE THE FILE

Documents commonly requested.

A current and internally consistent file helps lenders understand the real funding gap.

01Entity, borrower and guarantor details
02Title, valuation and existing security position
03Current debt statements and payout figures
04Quantity-surveyor or independent progress evidence
05Updated contract, remaining scope and construction program
06Use-of-funds schedule, contingency and proposed exit evidence

COST TO COMPLETE FAQS

Straight answers before assessment.

These answers are general guidance only. Every project and lender policy is different.

What is cost-to-complete finance?+

Cost-to-complete finance is business-purpose funding structured around the verified capital still required to finish an eligible property development. It may be used alongside a refinance or as part of a broader completion strategy, subject to lender assessment.

How is the remaining cost verified?+

A lender may require an independent quantity-surveyor report, updated building contract, remaining-scope schedule, progress claims, consultant reports, contingency allowance and evidence of outstanding statutory or professional costs.

Can cost overruns be included?+

Verified overruns may form part of the assessment when their cause, amount and effect on the completion program are understood. The lender may require additional borrower equity, revised contracts or other risk controls.

What if the existing lender has stopped funding?+

The current debt, available facility, drawdown history, lender position and remaining work must be reviewed. A refinance or replacement facility may be considered, but approval and timing depend on due diligence and lender criteria.

How are progress payments managed?+

Construction funding is commonly released through controlled drawdowns after evidence of completed work and applicable conditions has been accepted. The exact process depends on the lender, project and loan documents.

What exit strategies may be considered?+

Potential exits include completing and settling contracted sales, selling completed stock, refinancing the finished asset or another evidenced liquidity event. The proposed exit must be credible, timed and supported by current information.

START WITH THE FUNDING GAP

Request a confidential project review.

Share the work completed, current debt, verified remaining budget, available equity, project timetable and proposed repayment exit.

Discuss the remaining works and funding gap.

Have the project location, work completed, remaining scope and cost, current debt, available funds, completion timetable and proposed exit ready. Indicate whether remaining costs have been independently verified.

You will enter your details on our contact page. Do not include passwords, banking credentials or other highly sensitive information.

Open the contact form

All finance is subject to lender assessment, due diligence and approval. Fees, charges and eligibility criteria apply.

Aaron Sterenzon, Director of Basic Finance Loans

A direct point of contact

Discuss the complete position with Aaron.

Share the current build status, verified remaining works, cost report, existing facility, contingency, completion value and repayment exit. Aaron will explain whether a direct-lending or facilitated business-finance pathway is worth assessing.

Business and eligible corporate investment finance. We do not provide regulated consumer credit. Eligible corporate-borrower investment scenarios may be considered, including short-term rural and lifestyle property finance where the corporate borrower is on title. Borrower structure, purpose, security and applicable legal requirements are assessed case by case. All applications are subject to lender assessment and approval. Read our lending policy