Construction completion finance begins with a clear picture of the project as it stands today. When a development stalls, a headline loan amount can look reassuring, but a proposed facility is not necessarily the amount available to pay the builder.

Existing debt may need to be repaid. Interest, fees and professional costs may be paid or retained from the facility. The remaining work may also cost more than the original budget allowed. The question that matters is not only “What facility might be available?” It is “After all required payments and costs, is there enough net funding to complete the project and reach a credible exit?”

That is the central test in construction completion finance. A lender needs to understand the project as it stands today, the full cost of getting it to a defined completion point, the funding sources available along the way and how the facility is expected to be repaid.

This guide shows how to build that picture before you submit a project for review.

The practical test: Reconcile every dollar required from the current site condition through to completion and repayment. A facility that covers the next progress claim may still leave a later funding gap.

Gross facility is not the same as net completion funding

The gross facility is the proposed total loan limit. Net completion funding is the amount potentially left for project costs after required payouts, retained amounts and transaction costs are accounted for.

Start with a sources-and-uses schedule:

Funding calculation What to include
Proposed gross facility The total limit being assessed, subject to lender approval and conditions
Less: existing debt and payout items Current lender payout, accrued interest, arrears and discharge amounts where applicable
Less: facility and transaction costs Applicable lender, valuation, quantity-surveyor, legal and monitoring costs
Less: amounts retained or paid elsewhere Interest reserves, required pay-outs and other amounts under the proposed structure
Equals: potential net amount for the project Reconcile this against the verified remaining budget and confirmed borrower contribution

This is a planning framework, not a loan quote. The treatment of each item depends on the lender, facility documents and project. Ask for the proposed gross amount, deductions, drawdown conditions and net funds available to be shown clearly.

Build the funding requirement from the site up

An old contract balance or the amount of the next invoice is not a complete cost-to-complete figure. The project team should establish what is physically complete, what remains, what must be corrected and what costs will continue while the project is finished and sold or refinanced.

1. Confirm the current debt and security position

Obtain current statements and payout figures for all lenders. Record the facility limit, amount drawn, undrawn amount, expiry date, arrears and any conditions that affect future advances. An undrawn balance should not be treated as available until the existing lender confirms that it remains accessible and explains the conditions for release.

List mortgages, caveats and other interests affecting the property. Consent, priority and discharge arrangements can affect whether a proposed refinance or additional facility can proceed. Ask a qualified solicitor to advise on the documents and legal position.

2. Record completed work and the current site condition

Prepare a clear record of work completed, paid work, unpaid claims, incomplete items and known defects. Reconcile the physical site with progress claims, invoices, plans, approvals and prior reports. Where appropriate, commission an independent inspection or quantity-surveyor review.

Separate disputed claims from amounts that are agreed. Identify any work that needs rectification, re-inspection or certification before the next stage can proceed.

3. Reprice the remaining scope

Get an updated schedule for the work still required. If the original builder is no longer engaged, the replacement scope should account for inherited work, defects, remobilisation, exclusions, trade availability and the revised program. A replacement quote should be reconciled against the independent assessment so that omitted items and duplicated costs are visible.

For a builder transition, see the replacement-builder completion finance guide.

4. Add the costs around the construction contract

The remaining construction price may not include all the money needed to reach the chosen completion point. Check whether the budget allows for:

  • consultants, engineers, surveyors, certifiers and project management;
  • permits, authority requirements, inspections and certification;
  • defect investigation, remediation and rework;
  • insurance, site security, utilities and ongoing holding costs;
  • interest and facility costs over the revised timeframe;
  • marketing, sales, settlement or refinance expenses; and
  • a justified contingency for identified project risks.

Our cost-to-complete finance guide goes deeper into common cost categories and how to reconcile them.

5. Show confirmed sources separately from hoped-for sources

List borrower equity, committed investor funds and any other verified contribution with the amount and expected availability date. Keep unapproved finance, forecast sales and uncommitted contributions separate. They may be part of a broader strategy, but should not be presented as cash already available to pay completion costs.

The completion funding gap formula

Use one consistent schedule to calculate the funding gap:

Funding gap = verified remaining project costs + existing debt and required payouts + finance, transaction and holding costs to the proposed exit + explained contingency − confirmed available facility funds − confirmed borrower or investor contributions.

The schedule should use the same cost assumptions, timing and completion point throughout. If the builder’s program, valuation, lender payout or expected sale date changes, update the funding schedule rather than relying on an old total.

How a lender may assess the project

Construction completion finance is generally assessed against the complete project and proposed repayment—not just the amount of work already done. Depending on the transaction, a lender may review:

  • the property and accepted current and on-completion values;
  • existing exposure and the amount required to refinance it;
  • verified remaining works and independent cost-to-complete evidence;
  • the builder, contract, program and delivery capability;
  • approvals, insurance, defects and legal interests;
  • borrower equity, contingency and total project exposure; and
  • a supported sale, refinance or other repayment exit.

Some eligible business-purpose developments may be assessed against gross realisation value (GRV). Basic Finance’s service page states that up to 90% of lender-accepted GRV may be considered for selected eligible projects only. That is not a standard maximum, a promise of approval or the amount of cash available for remaining works. Loan-to-cost limits, existing debt, interest, fees, contingency, equity and other lender criteria can reduce the facility. Read the construction completion finance assessment details.

A document checklist for your first project review

Preparing a consistent file can make it easier to identify what is known, what still needs verification and where the funding gap sits. Gather what is available:

  • property address, ownership and borrower or entity details;
  • current lender statements, facility documents and payout figures;
  • a record of work completed, paid, unpaid and disputed;
  • current site photos and relevant inspection or quantity-surveyor reports;
  • updated remaining-scope schedule, contract or replacement-builder proposal;
  • current construction program, approvals and insurance information;
  • sources-and-uses schedule, available equity and contingency;
  • current and on-completion valuation information, if available; and
  • proposed repayment exit and supporting evidence.

The lender may request further reports or documents after reviewing the project. Do not delay urgent legal, safety, insurance or insolvency advice while assembling a finance file.

Common mistakes that obscure the real funding gap

Treating the undrawn limit as guaranteed cash. Confirm in writing whether the amount remains available and what conditions apply.

Using the old contract balance as the new completion budget. A changed builder, defects, remobilisation, escalation or incomplete scope can alter the price.

Leaving out interest and holding costs. A longer completion or sales period can change how much funding is required.

Counting unconfirmed sources as available funds. Show confirmed contributions separately from proposed or conditional finance and future receipts.

Focusing on leverage before testing feasibility. A headline LVR or GRV figure does not establish that the full project is funded or the exit is achievable.

Frequently asked questions

What is construction completion finance?

It is specialist property finance that may help refinance eligible project debt, fund verified remaining works, or address both needs for a business-purpose development that is already partly built. The structure and availability depend on lender assessment and the project.

Does the facility amount equal the money available for the builder?

Not necessarily. Existing debt, fees, costs, retained interest and other amounts may be paid from or accounted for within the facility. Ask for the proposed net funds and drawdown conditions, then compare them with the full verified completion budget.

Can construction completion finance refinance the current lender?

It may be considered where the proposed lender accepts the property, debt, project position, remaining costs, delivery plan and exit. A current payout figure and complete funding requirement are important parts of the review.

Can finance be considered after a builder change or failure?

Potentially, but the project needs a credible delivery plan. The legal status of the existing contract, site access, defects, insurance, approvals, replacement builder, revised cost and completion program may all require review.

Is up to 90% of GRV available for every project?

No. Basic Finance notes that up to 90% of lender-accepted GRV may be considered only for selected eligible business-purpose projects. It is not a standard maximum or guaranteed approval, and it does not mean that 90% is available as net cash for works. Other lender limits and project costs apply.

What is the most important information to prepare?

Start with the existing debt and payout, current site condition, independently supported remaining cost, confirmed funding sources, builder and program, and a credible repayment exit. Keep the figures and dates consistent across the documents.

Start with the net funding position

Before comparing headline facility amounts, establish the project’s current position and reconcile the total cost through to completion and repayment. That gives the lender a clearer basis to assess whether a construction completion pathway may fit.

Discuss a construction completion scenario with Basic Finance or call 0439 462 664. For an initial review, be ready to outline the property, current debt, construction stage, verified remaining works, confirmed funds and proposed exit.

Important information: This article is general information only and is not financial, legal, building, tax or valuation advice. Finance is subject to lender criteria, due diligence, terms and approval. Rates, fees, leverage, conditions and timeframes vary. Property used as security may be at risk if repayment obligations are not met.

Business and eligible corporate investment finance. We do not provide regulated consumer credit. Eligible corporate-borrower investment scenarios may be considered, including short-term rural and lifestyle property finance where the corporate borrower is on title. Borrower structure, purpose, security and applicable legal requirements are assessed case by case. All applications are subject to lender assessment and approval. Read our lending policy